Cstan98 Just In Time (JIT) Template

<Source: Wikipedia, internet.>

 

 

  1. JIT (Just In Time) = an inventory strategy that reduce in-process inventory & associated costs.

  2. Reduce Waste:

    1. Time in traffic jams.

    2. Inventory in transport inventory.

    3. Scrap Fuel while not physically moving.

  3. Design Flow Process:

    1. Redesign/Re-layout For Flow.

    2. Reduce Lot Sizes.

    3. Link Operations.

    4. Balance Workstation Capacity.

    5. Preventive Maintenance.

    6. Reduce Setup Times.

  4. Total Quality Control:

    1. Worker Compliance.

    2. Automatic Inspection.

    3. Quality Measures.

    4. Fail-safe Methods.

    5. Worker Participation.

  5. Stabilize Schedule:

    1. Level Schedule.

    2. Establish Freeze Windows.

    3. Underutilize Capacity.

  6. Kanban Pull System:

    1. Demand Pull.

    2. Backflush.

    3. Reduce Lot Sizes.

  7. Work With Vendors:

    1. Reduce Lead Time.

    2. Frequent Deliveries.

    3. Project Usage Requirements.

    4. Quality Expectations.

  8. Further Reduce Inventory In Other Areas:

    1. Stores.

    2. Transit.

    3. Other Motion Waste.

    4. Conveyor Belts Motion Waste.

  9. Improve Product Design:

    1. Standard Production Configuration.

    2. Standardize & Reduce Number Of Parts.

    3. Process Design With Product Design.

    4. Quality Expectations.