<Source: Wikipedia, http://en.wikipedia.org/wiki/Activity-based_costing .>
Direct Cost.
Indirect Cost.
Overhead Cost.
Cost Centre.
Cost Allocation.
Fixed Cost.
Variable Cost.
Cost Driver.
Cost Driver Rate.
E.g. Cost = Fixed Cost + Variable Cost (Cost Driver * Cost Driver Rate).